9 November 2026The building permit has arrived

Duino Aurisina · Località Duino 69/A · New build

Elegie Duino — eight new homes in Duino

Eight new homes in the village where Rilke began the Duino Elegies. Six are still available.

  • Available 6 of 8
  • One and two bedrooms 70–102 m²
  • From € 261,000 + VAT
  • Class A by design
  • Handover expected by June 2028

Today · 12 August 2026

The plot is that gap between the houses.

A drone photograph: the Castle, the sea, the village. The only thing added is the magenta outline of the Elegie plot, in the foreground next to the road.

Tomorrow · handover expected by June 2028

In its place, the building.

We rebuilt it in 3D from the drawings of Studio Architettura Soldano, down to the September construction drawings: dimensions, windows, verandas, orientation. The village around it is the real one, from the Region's surveys. The model is measured, not generated.

01 · The place

The village, measured.

Duino is a village of a few streets between the Karst and the sea. From the gate you walk to the little harbour, the Rilke Path and the Castle, where in January 1912 Rilke began the Duino Elegies: these homes take their name from there. By car, Trieste and the airport.

  • Duino Castle380 m5 min
  • Rilke Path, start280 m4 min
  • Duino harbour650 m9 min
  • Bus stop "Duino centro"200 m3 min
  • Village grocery180 m2 min
  • Primary schools (Italian and Slovene)180 m2 min
  • Rilke Path to Sistiana2.3 km30 min
Times calculated on OpenStreetMap roads (OSRM), at a normal walking pace and with free-flowing traffic.
Duino from above on 12 August 2026: the Castle above the sea, the village, and in the foreground, outlined in magenta, the empty plot where Elegie will stand
The south front of Elegie at sunset, with the private gardens: image generated with artificial intelligence
AI · animation

Ground floor

Evening, in the garden.

Every ground-floor home has its own private garden, enclosed by evergreen hedges: from 47 m² to 280 m². Three are still available.

02 · The homes

The homes, floor by floor.

A private garden on the ground floor, a veranda on the first. Tap a home to open its floor plan, the sun on its veranda and the full cost.

Site plan, Ground floor: each home in its own colour

Plans redrawn from the construction drawings of Studio Architettura Soldano (September 2026); the trees are indicative.

How you pay

  1. 10%on reservation
  2. 20%at the preliminary contract, before the notary
  3. 70%at the deed, expected by June 2028

Money paid before the deed is covered by a bank or insurance guarantee, as Italian law requires (Legislative Decree 122/2005). Prices exclude VAT. Each home has one outdoor parking space included; four more can be bought separately, €20,000 each.

The south front of Elegie Duino, with the glazed verandas on the garden
Rendering

First floor

Upstairs, the veranda.

The first-floor homes have a glazed veranda with a railing above the gardens and, in some rooms, the timber of the roof left exposed.

03 · The light

The sun, hour by hour.

The verandas face south-south-east. Pick a day and a time: light and shadows are calculated for Duino, with the real terrain, houses and trees.

The sun on Elegie

Sunrise —Sunset —Sun at —

Hours of direct sun on the veranda glazing on the chosen day

Home 1—
Home 2—
Home 3—
Home 4 · Sold—
Home 5 · Sold—
Home 6—
Home 7—
Home 8—
How it is calculated

Calculated on the outer glazing of each veranda (for home 1, on the edge of the porch), one and a half metres up, every five minutes, with the terrain (the Region's LiDAR), the neighbouring houses and the building itself. The second figure also counts the trees as solid crowns: the strictest count, since in winter many crowns are bare. No clouds; sunrise and sunset are those on a clear horizon.

04 · Timeline

Handover expected by June 2028.

The building permit arrived on 9 November 2026 and the builder has drawn up the works schedule: here is the build, step by step, from today's plot to the keys.

Until November 2026 we indicated handover by the end of 2027. The permit stage took longer than expected; now the builder has drawn up the works schedule and every step has its expected date: the handover of the homes and the signing of the deeds are expected by June 2028.

Milestone reached · 9 November 2026

The building permit has arrived.

The Municipality of Duino Aurisina has issued the building permit for Elegie, and on 9 November the builder handed it to us. It was the step still missing after the demolition in August: the build can now begin, and works are expected to start in November.

The next milestones →
  • Done
  • Pending
  • Forecast
  1. April 2026

    Done

    Landscape authorisation

    Granted on 17 April 2026.

  2. June 2026

    Done

    Sales open

    Already sold: 2 of 8.

  3. August 2026

    Done

    The old villa demolished

    The plot is clear: see the drone photo of 12 August and the 3D tour of 15 September.

  4. September 2026

    Done

    Construction drawings

    Studio Architettura Soldano's drawings of 3 September: the 3D model on this site is rebuilt from them.

  5. November 2026

    Done

    Building permit

    Issued by the Municipality of Duino Aurisina: the builder handed it to us on 9 November 2026.

  6. November 2026

    Pending

    Start of works

    With the permit in hand, construction is expected to start in November.

    See it in 3D
  7. January 2027

    Forecast

    Foundations complete

    Reinforced-concrete inverted-T ground beams.

    See it in 3D
  8. March 2027

    Forecast

    Timber structure complete

    The building's form can now be seen.

    See it in 3D
  9. June 2027

    Forecast

    Building closed in

    Roof, windows, external insulation.

    See it in 3D
  10. September 2027

    Forecast

    Façades finished

    The scaffolding comes down.

    See it in 3D
  11. October 2027

    Forecast

    Interior finishes

    Work begins on floors, bathrooms and doors.

    See it in 3D
  12. April 2028

    Forecast

    End of works and inspections

    The works are expected to finish on 30 April 2028.

    See it in 3D
  13. By June 2028

    Forecast

    Handover and deeds

    The keys to the homes, with the deed signed before a notary.

    See it in 3D

Buying today, step by step.

  1. 10%

    The reservation

    Once you have chosen your home, you sign the purchase offer and pay 10% of the price.

  2. 20%

    The preliminary contract, before a notary

    For homes still to be built, Italian law requires a notary: the preliminary contract sets the handover deadline and the guarantees, and everything paid before the deed is covered by a bank or insurance guarantee (Legislative Decree 122/2005).

  3. The site, up close

    Site visits follow safety rules: access and a visiting calendar are being agreed with the builder, and we will share them with buyers.

  4. 70%

    Deed and handover

    Expected by June 2028, after the end of works and the inspections. On signing the deed, the builder also hands over the ten-year insurance policy on the building.

Percentages of the price, excluding VAT. The protections of Legislative Decree 122/2005 apply to buyers who are individuals (natural persons); the offer, the preliminary contract and the notary set out the details.

We will tell you, step by step.

Every milestone is published here, with its date and pictures of the site, and sent by email to buyers and to anyone who asks.

Get the updates by email

These are forecasts, not commitments. The works schedule is in its first version: dates may change, even significantly, because of the weather, supplies or contractors. For buyers, what counts is the handover deadline written in their preliminary contract.

Updated on 9 November 2026, based on the first version of the builder's works schedule.

05 · How it is built

The build, month by month.

As you scroll, the building goes up as planned in the works schedule, from today's plot to the keys.


1November 2026Pending

It starts with the plot.

Clear since the demolition in August. The building permit arrived on 9 November, and construction is expected to start by the end of the month.

2January 2027Forecast

The foundations.

Reinforced-concrete inverted-T ground beams, sized according to the geological report and the structural calculations; under the ground floor, a ventilated underfloor void.

3March 2027Forecast

The timber structure.

Walls and floor slabs in X-LAM, cross-laminated spruce panels, CE-marked: the building's form can now be seen. The roof rests on glulam beams; in some first-floor rooms the timber is left exposed.

4June 2027Forecast

Closed in.

Roof, windows and external insulation. The insulation is rock wool, which is non-combustible (Euroclass A1); the window frames are thermally broken, in anthracite grey, with laminated low-emissivity double glazing. The flat roof, ballasted with river pebbles, will carry each home's solar panels.

5September 2027Forecast

Façades finished, scaffolding down.

A dark warm-grey render, the colour approved with the landscape authorisation; on the street side, vertical-slat shutters.

6October 2027Forecast

Inside, the finishes.

Floors, tiling, doors: the buyers' choices take shape, home by home.

7April 2028Forecast

End of works and inspections.

Gardens with evergreen hedges and native Karst plants; parking in permeable concrete, each space with provision for an electric-car charger.

8By June 2028Forecast

The keys.

Handover of the homes and signing of the deeds. The energy certificate is issued once the works are finished: class A NZEB is the design rating.

And inside, no gas.

  • An air-to-water heat pump: heating, cooling and hot water
  • A photovoltaic system for every home, and a separate electricity meter for each, up to 6 kW
  • Energy class A NZEB by design
  • Security front door (burglar-resistance class 3 or higher), video intercom, provision for an alarm system and home automation

06 · Who is behind it

Three names, one site.

07 · Contact

A visit, by appointment.

The site, the floor plans, the finishes: write or call us and we will get back to you.

Write to us

We reply wherever you prefer: one contact is enough.

What are you interested in?
Which homes?

Thank you, your request has arrived.

We will get back to you soon. For anything urgent: +39 331 8940822.