Duino Aurisina · Località Duino 69/A · New build
Elegie Duino — eight new homes in Duino
Eight new homes in the village where Rilke began the Duino Elegies. Six are still available.
- Available 6 of 8
- One and two bedrooms 70–102 m²
- From € 261,000 + VAT
- Class A by design
- Handover expected by June 2028
Today · 12 August 2026
The plot is that gap between the houses.
A drone photograph: the Castle, the sea, the village. The only thing added is the magenta outline of the Elegie plot, in the foreground next to the road.
Tomorrow · handover expected by June 2028
In its place, the building.
We rebuilt it in 3D from the drawings of Studio Architettura Soldano, down to the September construction drawings: dimensions, windows, verandas, orientation. The village around it is the real one, from the Region's surveys. The model is measured, not generated.
01 · The place
The village, measured.
Duino is a village of a few streets between the Karst and the sea. From the gate you walk to the little harbour, the Rilke Path and the Castle, where in January 1912 Rilke began the Duino Elegies: these homes take their name from there. By car, Trieste and the airport.
- Duino Castle380 m5 min
- Rilke Path, start280 m4 min
- Duino harbour650 m9 min
- Bus stop "Duino centro"200 m3 min
- Village grocery180 m2 min
- Primary schools (Italian and Slovene)180 m2 min
- Rilke Path to Sistiana2.3 km30 min
- Sistiana Bay4.2 km7 min
- Portopiccolo4.2 km7 min
- Monfalcone7.4 km11 min
- Slovenian border (Jamiano)8.0 km11 min
- Trieste Airport18.4 km18 min
- Trieste, Piazza Unità23.9 km30 min


Ground floor
Evening, in the garden.
Every ground-floor home has its own private garden, enclosed by evergreen hedges: from 47 m² to 280 m². Three are still available.
02 · The homes
The homes, floor by floor.
A private garden on the ground floor, a veranda on the first. Tap a home to open its floor plan, the sun on its veranda and the full cost.
Plans redrawn from the construction drawings of Studio Architettura Soldano (September 2026); the trees are indicative.
How you pay
- 10%on reservation
- 20%at the preliminary contract, before the notary
- 70%at the deed, expected by June 2028
Money paid before the deed is covered by a bank or insurance guarantee, as Italian law requires (Legislative Decree 122/2005). Prices exclude VAT. Each home has one outdoor parking space included; four more can be bought separately, €20,000 each.

First floor
Upstairs, the veranda.
The first-floor homes have a glazed veranda with a railing above the gardens and, in some rooms, the timber of the roof left exposed.
03 · The light
The sun, hour by hour.
The verandas face south-south-east. Pick a day and a time: light and shadows are calculated for Duino, with the real terrain, houses and trees.
The sun on Elegie
Hours of direct sun on the veranda glazing on the chosen day
How it is calculated
Calculated on the outer glazing of each veranda (for home 1, on the edge of the porch), one and a half metres up, every five minutes, with the terrain (the Region's LiDAR), the neighbouring houses and the building itself. The second figure also counts the trees as solid crowns: the strictest count, since in winter many crowns are bare. No clouds; sunrise and sunset are those on a clear horizon.
04 · Timeline
Handover expected by June 2028.
The building permit arrived on 9 November 2026 and the builder has drawn up the works schedule: here is the build, step by step, from today's plot to the keys.
Until November 2026 we indicated handover by the end of 2027. The permit stage took longer than expected; now the builder has drawn up the works schedule and every step has its expected date: the handover of the homes and the signing of the deeds are expected by June 2028.
Milestone reached · 9 November 2026
The building permit has arrived.
The Municipality of Duino Aurisina has issued the building permit for Elegie, and on 9 November the builder handed it to us. It was the step still missing after the demolition in August: the build can now begin, and works are expected to start in November.
The next milestones →- Done
- Pending
- Forecast
April 2026
DoneLandscape authorisation
Granted on 17 April 2026.
June 2026
DoneSales open
Already sold: 2 of 8.
August 2026
DoneThe old villa demolished
The plot is clear: see the drone photo of 12 August and the 3D tour of 15 September.
September 2026
DoneConstruction drawings
Studio Architettura Soldano's drawings of 3 September: the 3D model on this site is rebuilt from them.
November 2026
DoneBuilding permit
Issued by the Municipality of Duino Aurisina: the builder handed it to us on 9 November 2026.
November 2026
PendingStart of works
With the permit in hand, construction is expected to start in November.
See it in 3DJanuary 2027
ForecastFoundations complete
Reinforced-concrete inverted-T ground beams.
See it in 3DMarch 2027
ForecastTimber structure complete
The building's form can now be seen.
See it in 3DJune 2027
ForecastBuilding closed in
Roof, windows, external insulation.
See it in 3DSeptember 2027
ForecastFaçades finished
The scaffolding comes down.
See it in 3DOctober 2027
ForecastInterior finishes
Work begins on floors, bathrooms and doors.
See it in 3DApril 2028
ForecastEnd of works and inspections
The works are expected to finish on 30 April 2028.
See it in 3DBy June 2028
ForecastHandover and deeds
The keys to the homes, with the deed signed before a notary.
See it in 3D
Buying today, step by step.
- 10%
The reservation
Once you have chosen your home, you sign the purchase offer and pay 10% of the price.
- 20%
The preliminary contract, before a notary
For homes still to be built, Italian law requires a notary: the preliminary contract sets the handover deadline and the guarantees, and everything paid before the deed is covered by a bank or insurance guarantee (Legislative Decree 122/2005).
The site, up close
Site visits follow safety rules: access and a visiting calendar are being agreed with the builder, and we will share them with buyers.
- 70%
Deed and handover
Expected by June 2028, after the end of works and the inspections. On signing the deed, the builder also hands over the ten-year insurance policy on the building.
Percentages of the price, excluding VAT. The protections of Legislative Decree 122/2005 apply to buyers who are individuals (natural persons); the offer, the preliminary contract and the notary set out the details.
We will tell you, step by step.
Every milestone is published here, with its date and pictures of the site, and sent by email to buyers and to anyone who asks.
Get the updates by emailThese are forecasts, not commitments. The works schedule is in its first version: dates may change, even significantly, because of the weather, supplies or contractors. For buyers, what counts is the handover deadline written in their preliminary contract.
Updated on 9 November 2026, based on the first version of the builder's works schedule.
05 · How it is built
The build, month by month.
As you scroll, the building goes up as planned in the works schedule, from today's plot to the keys.
It starts with the plot.
Clear since the demolition in August. The building permit arrived on 9 November, and construction is expected to start by the end of the month.
The foundations.
Reinforced-concrete inverted-T ground beams, sized according to the geological report and the structural calculations; under the ground floor, a ventilated underfloor void.
The timber structure.
Walls and floor slabs in X-LAM, cross-laminated spruce panels, CE-marked: the building's form can now be seen. The roof rests on glulam beams; in some first-floor rooms the timber is left exposed.
Closed in.
Roof, windows and external insulation. The insulation is rock wool, which is non-combustible (Euroclass A1); the window frames are thermally broken, in anthracite grey, with laminated low-emissivity double glazing. The flat roof, ballasted with river pebbles, will carry each home's solar panels.
Façades finished, scaffolding down.
A dark warm-grey render, the colour approved with the landscape authorisation; on the street side, vertical-slat shutters.
Inside, the finishes.
Floors, tiling, doors: the buyers' choices take shape, home by home.
End of works and inspections.
Gardens with evergreen hedges and native Karst plants; parking in permeable concrete, each space with provision for an electric-car charger.
The keys.
Handover of the homes and signing of the deeds. The energy certificate is issued once the works are finished: class A NZEB is the design rating.
And inside, no gas.
- An air-to-water heat pump: heating, cooling and hot water
- A photovoltaic system for every home, and a separate electricity meter for each, up to 6 kW
- Energy class A NZEB by design
- Security front door (burglar-resistance class 3 or higher), video intercom, provision for an alarm system and home automation
06 · Who is behind it
Three names, one site.
Builds

Ennio Riccesi Holding Promotes and builds the scheme.
riccesi.eu ↗Designs

Studio Architettura Soldano Arch. Pier Paolo Soldano and Arch. Alessandra Belleli, Trieste.
studioarchitetturasoldano.it ↗Sells

TriesteVillas For buyers from here and from abroad.
triestevillas.com ↗
07 · Contact
A visit, by appointment.
The site, the floor plans, the finishes: write or call us and we will get back to you.
- Sales office
- Via Torino 34, Trieste
Thank you, your request has arrived.
We will get back to you soon. For anything urgent: +39 331 8940822.